Since last June when we hired Caldwell Paving, we've been waiting for them to come and re-pave our crumbling, sorry-looking driveway (pictured above) with 2.5 inches of asphalt. Randy called them time and time again throughout the months we were home, and finally told them not to come last fall since it was too cold in November for it to hold well. We came home from Ryan's after a quick weekend visit the end of March because they told us they'd be coming in April. Then all this spring, we kept getting put off due to equipment mal-functions, rain, etc. etc., but finally they said they planned to get it done in August.
 |
| It was so exciting when they finally showed up Aug. 23 to start prepping it. |
 |
| They cut a nice clean edge they would put the pavement up against all along the drive. |
 |
| They spent two days digging up crumbling asphalt and carrying it away, and then putting down "pug" that they would pave on top of where they'd removed asphalt. They said the paving team would come about a week later. |
 |
| Then the rains came, and we saw a problem with the grade and run-off, and we also couldn't get our boat or motor home out without scraping badly. So they came back and spent two more days correcting the grade, which meant tearing up more old asphalt . . . |
 |
| . . . and scraping off a lot of dirt at the "crown" of the driveway to reduce the slope. |
 |
| They dug up more asphalt and put down about 4 inches of CTB (cement treated base) to pave on top of. |
Of course, we're not walking or driving on it yet. I sure hope it will hold up under our use once we do. It's not the kind of "anniversary gift" we can afford again!